Charge Your Car · EV charging site
Tyne and Wear Fire and Rescue Service HQ
Nissan Way, Washington, SR5 3QY
Tyne and Wear Fire and Rescue Service HQ is an EV charging site in Washington, Sunderland (SR5 3QY), run by Charge Your Car. Both of its sockets are 7 kW Type 2. Amp Map lists 1 other charge point named Tyne and Wear Fire and Rescue Service HQ in Washington. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wearside Farm (Washington) (evyve), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Tyne and Wear Fire and Rescue Service HQ
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Tyne and Wear Fire and Rescue Service HQ (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Tyne and Wear Fire and Rescue Service HQ (Charge Your Car) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Tyne and Wear Fire and Rescue Service HQ?
Tyne and Wear Fire and Rescue Service HQ is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Tyne and Wear Fire and Rescue Service HQ (Charge Your Car)?
Wearside Farm (Washington) (evyve) is 0.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tyne and Wear Fire and Rescue Service HQ (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tyne and Wear Fire and Rescue Service HQ (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tyne and Wear Fire and Rescue Service HQ (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Tyne and Wear Fire and Rescue Service HQ
- Wearside Farm (Washington)
- The Peel Centre Washington
- Cherry Blossom Way
- Nissan NMUK Test Track
- Nissan Hangar Car Park
- Cheapest nearby
- Wearside Farm (Washington) · 85p per kWh · 75 kW · 0.1 mi
- Fastest nearby
- Wearside Farm (Washington) · 75 kW · 0.1 mi