Charge Your Car · EV charging site
University of Sunderland St Peters Campus
University of Sunderland St Peters Campus, SR6 3SD
University of Sunderland St Peters Campus is an EV charging site in Sunderland (SR6 3SD), run by Charge Your Car. It has a single 7 kW Type 2 socket. Amp Map lists 1 other charge point named University of Sunderland St Peters Campus in Sunderland. 25 other charging sites are listed within a mile, and the nearest site with 50 kW or more is West Wear Street (Fastned), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- University of Sunderland St Peters Campus
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at University of Sunderland St Peters Campus (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does University of Sunderland St Peters Campus (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates University of Sunderland St Peters Campus?
University of Sunderland St Peters Campus is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to University of Sunderland St Peters Campus (Charge Your Car)?
West Wear Street (Fastned) is 0.3 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at University of Sunderland St Peters Campus (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at University of Sunderland St Peters Campus (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at University of Sunderland St Peters Campus (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- University of Sunderland St Peters Campus
- West Wear Street
- Charles Street Car Park
- Charles Street, Sunderland
- Sunniside Car Park
- Nile Street
- Cheapest nearby
- West Wear Street · 79p per kWh · 400 kW · 0.3 mi
- Fastest nearby
- West Wear Street · 400 kW · 0.3 mi