# Wealden District Council · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-wealden-district-council-uk

Wealden District Council is an EV charging site in Hailsham, East Sussex, run by Charge Your Car. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as £1.00/charge admin fee.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Vicarage Lane, BN27 2AX
- **Area:** Hailsham, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.86474, 0.25993

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** £1.00/charge admin fee (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Wealden District Council (Charge Your Car)?

The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.

### How fast is charging at Wealden District Council (Charge Your Car)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Wealden District Council (Charge Your Car) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Wealden District Council?

Wealden District Council is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Wealden District Council (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wealden District Council (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wealden District Council (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hailsham](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/hailsham)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Pod Point Tesco Superstore - Hailsham](https://ampmap.co.uk/charger/pod-point-tesco-superstore-hailsham-2-uk) - Type 2 7 kW · North Street · From 44.4p/kWh
- [Hellingly Community Hub · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-hellingly-community-hub-uk) - Type 2 22 kW · The Drive
- [Herstmonceux Surgery · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-herstmonceux-surgery-uk) - CCS 50 kW, CHAdeMO 50 kW · Herstmonceux
- [Pod Point Farleys House and Gallery Ltd](https://ampmap.co.uk/charger/pod-point-farleys-house-and-gallery-ltd-uk) - Type 2 7 kW · Muddles Green Chiddingly · From 25.2p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-wealden-district-council-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Jun 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
