Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Wilkinson Park & Ride

Wilkinson Park & Ride, Basford, NG7 7NW

Wilkinson Park & Ride is an EV charging site in Basford, Nottingham, run by BP Pulse. Its 19 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 34% uptime and recorded 58 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge EV Aldi Basford, 0.6 miles away.

Status

7 of 19 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or CHAdeMO or Type 2 · 50 kW1 connector · 89p per kWhOut of service
245620% reliabilityOut of order
Type 2 · 7 kW18 connectors · 65p per kWh7 free11 out of service
11106100% reliabilityAvailable
11106100% reliabilityAvailable
11107100% reliabilityAvailable
11107100% reliabilityAvailable
111080% reliabilityOut of order
111080% reliabilityOut of order
111090% reliabilityOut of order
111090% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
11106

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 244 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Wilkinson Park & Ride (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Wilkinson Park & Ride (BP Pulse)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Wilkinson Park & Ride (BP Pulse) have?

19 charging sockets: 18 × 7 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 44 kW Type 2. Live per-socket availability is shown on this page.

When is Wilkinson Park & Ride (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Wilkinson Park & Ride (BP Pulse)?

Amp Map measured 34% uptime here from recorded live status over the last 30 days, across 58 observed charging sessions.

Who operates Wilkinson Park & Ride?

Wilkinson Park & Ride is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Wilkinson Park & Ride (BP Pulse)?

Shell Recharge EV Aldi Basford is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wilkinson Park & Ride (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wilkinson Park & Ride (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wilkinson Park & Ride (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.