Chargemaster · EV charging site
Costco
Hanworth Road, Sunbury-on-Thames, TW16
Costco is an EV charging site in Sunbury-on-Thames, Surrey, run by Chargemaster. It has a single 7 kW Type 2 socket, and charging is listed as free. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Kempton Park SF Connect (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 30 Oct 2015)
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Getting there
- Underground Car Park, Costco Members Only, Check in with the Tyre Department for Activation
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Costco (Chargemaster)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Costco (Chargemaster)?
Up to 7 kW AC via Type 2.
How many charging sockets does Costco (Chargemaster) have?
1 charging socket: 16 × 7 kW Type 2.
Who operates Costco?
Costco is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Can anyone charge at Costco (Chargemaster)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Costco (Chargemaster)?
Kempton Park SF Connect (BP Pulse) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Costco (Chargemaster)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Costco (Chargemaster)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Costco (Chargemaster)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Sunbury-On-Thames
- Kempton Park SF Connect
- BP Building E Undercroft Car Park
- Texaco Herds Garage
- ubitricity Distributed Energy Systems UK Ltd. 25 South Road
- ubitricity Distributed Energy Systems UK Ltd. 8 Raleigh Road, Outside 8
- Cheapest nearby
- Pod Point Tesco Extra - Sunbury-On-Thames · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Kempton Park SF Connect · 150 kW · 0.6 mi