Chargemaster · EV charging site
First On Scene Training
82 Headingley Lane, Chapel Allerton, LS6 2DH
First On Scene Training is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Chargemaster. Both of its sockets are 7 kW Type 2. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Riverside Service Station (InstaVolt Ltd), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at First On Scene Training (Chargemaster)?
Up to 7 kW AC via Type 2.
How many charging sockets does First On Scene Training (Chargemaster) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates First On Scene Training?
First On Scene Training is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Where is the nearest charger with 50 kW or more to First On Scene Training (Chargemaster)?
Riverside Service Station (InstaVolt Ltd) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at First On Scene Training (Chargemaster)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at First On Scene Training (Chargemaster)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at First On Scene Training (Chargemaster)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tetley Gate
- Pod Point Burton Lea
- Pod Point The Spool House
- Pod Point Moor Grange
- Castle Grove
- Pod Point Willow House
- Cheapest nearby
- Pod Point Moor Grange · Free · 7 kW · 0.5 mi
- Fastest nearby
- Castle Grove · 22 kW · 0.6 mi