Chargemaster · EV charging site
Grange Jaguar/Land Rover Barnet
Victors Way, Barnet, EN5 2JA
Grange Jaguar/Land Rover Barnet is an EV charging site in Barnet, Greater London, run by Chargemaster. All 4 of its sockets are 7 kW Type 2. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is M&S Whetstone (BP Pulse), 1.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Notes
- Two dual charge points at JLR dealership.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Grange Jaguar/Land Rover Barnet (Chargemaster)?
Up to 7 kW AC via Type 2.
How many charging sockets does Grange Jaguar/Land Rover Barnet (Chargemaster) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates Grange Jaguar/Land Rover Barnet?
Grange Jaguar/Land Rover Barnet is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Can anyone charge at Grange Jaguar/Land Rover Barnet (Chargemaster)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Grange Jaguar/Land Rover Barnet (Chargemaster)?
M&S Whetstone (BP Pulse) is 1.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Grange Jaguar/Land Rover Barnet (Chargemaster)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grange Jaguar/Land Rover Barnet (Chargemaster)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grange Jaguar/Land Rover Barnet (Chargemaster)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Moxon Street Car Park
- Pod Point Fitzjohn Avenue Car Park
- Lamp Column on Union Street
- ubitricity Distributed Energy Systems UK Ltd. 171 High Street
- Pod Point Stapylton Road
- ubitricity Distributed Energy Systems UK Ltd. 88 Normandy Avenue
- Cheapest nearby
- Pod Point Moxon Street Car Park · 45.6p per kWh · 7 kW · 80 yd