Chargemaster · EV charging site
Kew Rd Parking/Charging
32-36 Kew Rd, Richmond, TW9 2NA
Kew Rd Parking/Charging is an EV charging site in Richmond, Greater London, run by Chargemaster. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 120 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Outside WTS Richmond (BP Pulse), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Getting there
- In Front of WTS Service Centre.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kew Rd Parking/Charging (Chargemaster)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Kew Rd Parking/Charging (Chargemaster) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Kew Rd Parking/Charging?
Kew Rd Parking/Charging is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Where is the nearest other charger with 50 kW or more to Kew Rd Parking/Charging (Chargemaster)?
Outside WTS Richmond (BP Pulse) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kew Rd Parking/Charging (Chargemaster)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kew Rd Parking/Charging (Chargemaster)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kew Rd Parking/Charging (Chargemaster)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Outside WTS Richmond
- ubitricity Distributed Energy Systems UK Ltd. 3 Salisbury Road
- ubitricity Distributed Energy Systems UK Ltd. opp 34 Shaftesbury Road
- ubitricity Distributed Energy Systems UK Ltd. 27 Salisbury Road
- ubitricity Distributed Energy Systems UK Ltd. opp 42 Shaftesbury Road
- ubitricity Distributed Energy Systems UK Ltd. 9 Evelyn Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 Salisbury Road · 56p per kWh · 5 kW · 0.1 mi