Chargemaster · EV charging site
SSE - Cumbernauld Cumbernauld Call Centre
3 Hunt Hill, Cumbernauld, G68 9LF
SSE - Cumbernauld Cumbernauld Call Centre is an EV charging site in Cumbernauld, North Lanarkshire, run by Chargemaster. It has a single 7 kW Type 2 socket, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Cumbernauld Retail Park, Cumbernauld (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 21 Dec 2015)
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
Up to 7 kW AC via Type 2.
How many charging sockets does SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster) have?
1 charging socket: 2 × 7 kW Type 2.
Who operates SSE - Cumbernauld Cumbernauld Call Centre?
SSE - Cumbernauld Cumbernauld Call Centre is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Can anyone charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
Cumbernauld Retail Park, Cumbernauld (Osprey Charging) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cumbernauld Retail Park, Cumbernauld
- Healthy Living and Enterprise Centre, Twechar
- Croy Railway Station, Croy
- Croy Park and Ride
- Craiglinn SF Connect
- Croy Park & Ride
- Cheapest nearby
- Cumbernauld Retail Park, Cumbernauld · 89p per kWh · 50 kW · 1.1 mi
- Fastest nearby
- Craiglinn SF Connect · 150 kW · 1.2 mi