# SSE - Cumbernauld Cumbernauld Call Centre · Chargemaster

Web page: https://ampmap.co.uk/charger/chargemaster-sse-cumbernauld-cumbernauld-call-centre-uk

SSE - Cumbernauld Cumbernauld Call Centre is an EV charging site in Cumbernauld, North Lanarkshire, run by Chargemaster. It has a single 7 kW Type 2 socket, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 3 Hunt Hill, G68 9LF
- **Area:** Cumbernauld, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.94295, -4.05928

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargemaster
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

Up to 7 kW AC via Type 2.

### How many charging sockets does SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster) have?

1 charging socket: 2 × 7 kW Type 2.

### Who operates SSE - Cumbernauld Cumbernauld Call Centre?

SSE - Cumbernauld Cumbernauld Call Centre is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.

### Can anyone charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at SSE - Cumbernauld Cumbernauld Call Centre (Chargemaster)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cumbernauld](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/cumbernauld)
- [Chargemaster chargers](https://ampmap.co.uk/networks/chargemaster)

## Chargers near this site

- [Cumbernauld Retail Park, Cumbernauld · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-cumbernauld-retail-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Cumbernauld Retail Park · From 89p/kWh
- [Healthy Living and Enterprise Centre, Twechar · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-healthy-living-and-enterprise-centre-twechar-uk) - Type 2 22 kW · Main Street
- [Croy Railway Station, Croy · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-croy-railway-station-croy-uk) - Type 2 7 kW · Constarry Road
- [Croy Park and Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-croy-park-and-ride-2-uk) - CCS 22 kW, CHAdeMO 22 kW · 61 Constarry Road
- [Craiglinn SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-craiglinn-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Craiglinn Park Road
- [Croy Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-croy-park-and-ride-uk) - Type 2 22 kW · 61 Constarry Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargemaster-sse-cumbernauld-cumbernauld-call-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Dec 2015).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
