Chargemaster · EV charging site
White City
White City, Acton, W12 0PT
White City is an EV charging site in Acton, Greater London, run by Chargemaster. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 786 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is [E-TAXI ONLY] Outside 11 Westway (BP Pulse), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at White City (Chargemaster)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does White City (Chargemaster) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates White City?
White City is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Where is the nearest other charger with 50 kW or more to White City (Chargemaster)?
[E-TAXI ONLY] Outside 11 Westway (BP Pulse) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at White City (Chargemaster)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at White City (Chargemaster)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at White City (Chargemaster)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- [E-TAXI ONLY] Outside 11 Westway
- ubitricity Distributed Energy Systems UK Ltd. 235 Du Cane Road, Outside 235
- Du Cane Road
- ubitricity Distributed Energy Systems UK Ltd. 41 Hilary Road, Outside No 41
- Hilary Road
- ubitricity Distributed Energy Systems UK Ltd. 229 Du Cane Road, Outside 229
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 235 Du Cane Road, Outside 235 · 56p per kWh · 5 kW · 160 yd