# 10 Grampian Road · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-10-grampian-road-uk

10 Grampian Road is an EV charging site in Aviemore, Highland, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 10 Grampian Road, PH22 1PF
- **Area:** Aviemore, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 57.19078, -3.82857

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.30/kWh; minimum fee £1.00 (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Car park adjacent to Tourist Information building.

## Common questions

### How much does it cost to charge at 10 Grampian Road (Chargeplace Scotland)?

The listed price is £0.30/kWh; minimum fee £1.00. Prices can change, so check the price at the charger before you start.

### How fast is charging at 10 Grampian Road (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does 10 Grampian Road (Chargeplace Scotland) have?

3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates 10 Grampian Road?

10 Grampian Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at 10 Grampian Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 10 Grampian Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 10 Grampian Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aviemore](https://ampmap.co.uk/chargers/united-kingdom/highland/aviemore)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Outside Winking Owl](https://ampmap.co.uk/charger/outside-winking-owl-uk) - Grampian Road
- [Aviemore · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-aviemore-uk) - CHAdeMO 50 kW, Type 2 50 kW · 10 Grampian Road
- [Aviemore SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-aviemore-sf-connect-uk) - CCS 150 kW · 62 Grampian Road
- [Aviemore, UK · Tesla](https://ampmap.co.uk/charger/tesla-aviemore-supercharger-uk) - CCS / Type 2 150 kW · Grampian Road · From 27p/kWh
- [High Range Hotel - 0030 · FOR EV](https://ampmap.co.uk/charger/for-ev-high-range-hotel-0030-uk) - CCS 50 kW, CHAdeMO 50 kW · Grampian Road · From 65p/kWh
- [Premier Inn Aviemore · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-aviemore-uk) - CCS 50 kW, CHAdeMO 50 kW · Grampian Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-10-grampian-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 31 May 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
