# Albert Building, Lerwick · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-albert-building-lerwick-uk

Albert Building, Lerwick is an EV charging site in Lerwick, Shetland Islands, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Albert Building, Lerwick, ZE1 0LL
- **Area:** Lerwick, Shetland Islands, United Kingdom
- **Coordinates (latitude, longitude):** 60.15514, -1.14287

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Albert Building, Lerwick (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Albert Building, Lerwick (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Albert Building, Lerwick (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Albert Building, Lerwick?

Albert Building, Lerwick is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Albert Building, Lerwick (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Albert Building, Lerwick (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Albert Building, Lerwick (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lerwick](https://ampmap.co.uk/chargers/united-kingdom/shetland-islands/lerwick)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Victoria Pier, Lerwick · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-victoria-pier-lerwick-uk) - Type 2 22 kW · Victoria Pier
- [ZE1 OLZ · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-ze1-olz-uk) - Type 2 7 kW
- [Fort Road Car Park, Lerwick · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-fort-road-car-park-lerwick-uk) - Type 2 7 kW · Fort Road
- [North Ness Council HQ · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-north-ness-council-hq-uk) - Type 2 7 kW · Mitchell's Road
- [North Ness Council Offices · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-north-ness-council-offices-uk) - Type 2 7 kW · 4A North Ness
- [Lerwick Health Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-lerwick-health-centre-uk) - Type 2 7 kW · South Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-albert-building-lerwick-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 23 Apr 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
