Chargeplace Scotland · EV charging site
Ardnamurchan Lighthouse Exhibition
Ardnamurchan Lighthouse Exhibition, Portuairk
Ardnamurchan Lighthouse Exhibition is an EV charging site in Portuairk, Argyll and Bute, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Kilchoan Ferry Terminal (Chargeplace Scotland), 5.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland) have?
1 charging socket: 2 × 7 kW Type 2.
Who operates Ardnamurchan Lighthouse Exhibition?
Ardnamurchan Lighthouse Exhibition is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland)?
Kilchoan Ferry Terminal (Chargeplace Scotland) is 5.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ardnamurchan Lighthouse Exhibition (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.