Chargeplace Scotland · EV charging site
Auchenncloich Road
Auchenncloich Road, Johnstone, PA12 2PZ
Auchenncloich Road is an EV charging site in Johnstone, Renfrewshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lochbarr Services - 0232 (FOR EV), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Access: Mon-Fri - 9am to 5pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Auchenncloich Road (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Auchenncloich Road (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Auchenncloich Road?
Auchenncloich Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Auchenncloich Road (Chargeplace Scotland)?
Lochbarr Services - 0232 (FOR EV) is 3.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Auchenncloich Road (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Auchenncloich Road (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Auchenncloich Road (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Old Course Ranfurly Golf Club
- Clyde Muirshiel Regional Park (3)
- Castle Semple Visitor Centre
- McKillop Institute
- McKillop Centre, Lochwinnoch
- Lochbarr Services - 0232
- Cheapest nearby
- Lochbarr Services - 0232 · 75p per kWh · 150 kW · 3.4 mi
- Fastest nearby
- Lochbarr Services - 0232 · 150 kW · 3.4 mi