# Ballachulish Hotel · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-ballachulish-hotel-uk

Ballachulish Hotel is an EV charging site in Fort William, Highland, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £1.00 minimum charge and £0.15 per kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Nr Fort William, PH49 4JY
- **Area:** Fort William, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 56.68769, -5.18506

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £1.00 minimum charge and £0.15 per kWh (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Ballachulish Hotel (Chargeplace Scotland)?

The listed price is £1.00 minimum charge and £0.15 per kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Ballachulish Hotel (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Ballachulish Hotel (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Ballachulish Hotel?

Ballachulish Hotel is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Ballachulish Hotel (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ballachulish Hotel (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ballachulish Hotel (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Fort William](https://ampmap.co.uk/chargers/united-kingdom/highland/fort-william)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Isles of Glencoe Hotel, Ballachulish · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-isles-of-glencoe-hotel-ballachulish-uk) - Type 2 22 kW · Glencoe
- [Birchbrae Highland Lodges](https://ampmap.co.uk/charger/birchbrae-highland-lodges-uk) - Type 2 7 kW · South Corran

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-ballachulish-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 24 May 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
