Chargeplace Scotland · EV charging site
Balloch- Drymen Road Car Park
Drymen Road, Vale of Leven, G83 8HS
Balloch- Drymen Road Car Park is an EV charging site in Vale of Leven, West Dunbartonshire, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Drymen Road Public Car Park (Chargeplace Scotland), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Balloch- Drymen Road Car Park (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Balloch- Drymen Road Car Park (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Balloch- Drymen Road Car Park?
Balloch- Drymen Road Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Balloch- Drymen Road Car Park (Chargeplace Scotland)?
Drymen Road Public Car Park (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Balloch- Drymen Road Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Balloch- Drymen Road Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Balloch- Drymen Road Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Drymen Road Public Car Park
- Lomond Service Station
- Loch Lomond Shores
- Queen of the Loch, Alexandria
- Vale of Leven District Hospital, Alexandria
- Vale Centre @ Vale of Leven Hospital
- Cheapest nearby
- Queen of the Loch, Alexandria · 89p per kWh · 150 kW · 0.8 mi
- Fastest nearby
- Lomond Service Station · 300 kW · 0.4 mi