# Banff Greenbank · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-banff-greenbank-uk

Banff Greenbank is an EV charging site in Banff, Aberdeenshire, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Banff Greenbank, AB45 1HE
- **Area:** Banff, Aberdeenshire, United Kingdom
- **Coordinates (latitude, longitude):** 57.66504, -2.51646

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Banff Greenbank (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Banff Greenbank (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does Banff Greenbank (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Banff Greenbank?

Banff Greenbank is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Banff Greenbank (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Banff Greenbank (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Banff Greenbank (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Banff](https://ampmap.co.uk/chargers/united-kingdom/aberdeenshire/banff)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Macduff Industrial Estate, Aberdeenshire Council · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-macduff-industrial-estate-aberdeenshire-council-uk) - Type 2 22 kW · Old Gamrie Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-banff-greenbank-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Jun 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
