Chargeplace Scotland · EV charging site
Bankhead Depot, Edinburgh
Bankhead Depot, Edinburgh, EH11 4HD
Bankhead Depot, Edinburgh is an EV charging site in Edinburgh, City of Edinburgh, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MFG Napier Service Station (MFG EV Power), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 26 Mar 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bankhead Depot, Edinburgh (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Bankhead Depot, Edinburgh (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Bankhead Depot, Edinburgh (Chargeplace Scotland) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Bankhead Depot, Edinburgh?
Bankhead Depot, Edinburgh is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Bankhead Depot, Edinburgh (Chargeplace Scotland)?
MFG Napier Service Station (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bankhead Depot, Edinburgh (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bankhead Depot, Edinburgh (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bankhead Depot, Edinburgh (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- MFG Napier Service Station
- Edinburgh College Sighthill Campus
- Westside Plaza Shopping Centre - 0240
- Wester Hailes Healthy Living Centre
- Murrayburn Depot
- Westgate Farm (Edinburgh)
- Cheapest nearby
- Westside Plaza Shopping Centre - 0240 · 69p per kWh · 100 kW · 0.6 mi
- Fastest nearby
- MFG Napier Service Station · 150 kW · 0.2 mi