# Black Isle Renewables Ltd, Dingwall · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-black-isle-renewables-ltd-dingwall-uk

Black Isle Renewables Ltd, Dingwall is an EV charging site in Inverness, Highland, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Culbokie, IV7 8JU
- **Area:** Inverness, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 57.62870, -4.25791
- **Getting there:** Located in the car park. Limited access.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates Black Isle Renewables Ltd, Dingwall?

Black Isle Renewables Ltd, Dingwall is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Black Isle Renewables Ltd, Dingwall (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Inverness](https://ampmap.co.uk/chargers/united-kingdom/highland/inverness)
- [Cheapest charging in Inverness](https://ampmap.co.uk/chargers/united-kingdom/highland/inverness/cheapest)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-black-isle-renewables-ltd-dingwall-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 19 Jul 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
