Chargeplace Scotland · EV charging site
Blyth Utilities, Alva Industrial Estate
Blyth House, Alloa, FK12 5DQ
Blyth Utilities, Alva Industrial Estate is an EV charging site in Alloa, Clackmannanshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is King Street Car Park, Alloa (Chargeplace Scotland), 2.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Blyth Utilities Access: Mon-Fri: 8am to 4:30pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Blyth Utilities, Alva Industrial Estate?
Blyth Utilities, Alva Industrial Estate is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland)?
King Street Car Park, Alloa (Chargeplace Scotland) is 2.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Blyth Utilities, Alva Industrial Estate (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Blyth Utilities
- Lower Cobden St Car Park
- Muirpark Gardens, Glenocil
- Main Street, Coalsnaughton
- Tillicoultry: Murray Square
- E-Centre
- Fastest nearby
- Lower Cobden St Car Park · 22 kW · 0.5 mi