# Breastworks Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-breastworks-car-park-uk

Breastworks Car Park is an EV charging site in Stranraer, Dumfries and Galloway, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Market Street, DG9 7RF
- **Area:** Stranraer, Dumfries and Galloway, United Kingdom
- **Coordinates (latitude, longitude):** 54.90594, -5.02968

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Breastworks Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Breastworks Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Breastworks Car Park (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Breastworks Car Park?

Breastworks Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Breastworks Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Breastworks Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Breastworks Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stranraer](https://ampmap.co.uk/chargers/united-kingdom/dumfries-and-galloway/stranraer)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Garo Dual 7KW · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-garo-dual-7kw-uk) - Type 2 7 kW · Fisher St Car Park
- [Pod Point Tesco Superstore - Stranraer](https://ampmap.co.uk/charger/pod-point-tesco-superstore-stranraer-uk) - Type 2 7 kW · Charlotte Street · From 44.4p/kWh
- [IONITY GmbH IONITY Stranraer](https://ampmap.co.uk/charger/ionity-gmbh-ionity-stranraer-uk) - CCS 350 kW · Lesley Retail Park, Bellevilla Road · From 83.3p/kWh
- [EH - Stranraer · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-stranraer-services-uk) - CCS 60 kW, CHAdeMO 60 kW · Bellevilla Rd 1 · From 85p/kWh
- [Galloway Community Hospital · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-galloway-community-hospital-uk) - Type 2 7 kW · Dalrymple Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-breastworks-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Feb 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
