# Bridge of Don Library Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-bridge-of-don-library-car-park-uk

Bridge of Don Library Car Park is an EV charging site in Aberdeen, Aberdeen City, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bridge of Don Library Car Park, AB22 8HH
- **Area:** Aberdeen, Aberdeen City, United Kingdom
- **Coordinates (latitude, longitude):** 57.18139, -2.09933

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Bridge of Don Library Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bridge of Don Library Car Park (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Bridge of Don Library Car Park (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Bridge of Don Library Car Park?

Bridge of Don Library Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Bridge of Don Library Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bridge of Don Library Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bridge of Don Library Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen)
- [Cheapest charging in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen/cheapest)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Starbucks Intown Road, Aberdeen · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-starbucks-intown-road-uk) - CCS 75 kW, CHAdeMO 50 kW · Intown Road · From 89p/kWh
- [Kettock Lodge · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kettock-lodge-uk) - Type 2 22 kW · Kettock Lodge
- [Aberdeen Exhibition and Conference Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-aberdeen-exhibition-and-conference-centre-uk) - Type 2 7 kW · 4 Exhibition Avenue
- [Davidson House · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-davidson-house-uk) - Type 2 7 kW · Davidson House
- [Exploration Drive, Bridge of Don · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-exploration-drive-bridge-of-don-uk) - CCS 50 kW, CHAdeMO 50 kW · Exploration Drive
- [Langstane Housing Association · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-langstane-housing-association-uk) - Type 2 22 kW · 680 King Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-bridge-of-don-library-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Apr 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
