Chargeplace Scotland · EV charging site
Brodick Street
Royston Road, Rutherglen, G21 2BS
Brodick Street is an EV charging site in Rutherglen, South Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Jenny Burn Oatlands, Glasgow (Osprey Charging), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Brodick Street (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Brodick Street (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Brodick Street?
Brodick Street is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Brodick Street (Chargeplace Scotland)?
Jenny Burn Oatlands, Glasgow (Osprey Charging) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brodick Street (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brodick Street (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brodick Street (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Jenny Burn Oatlands, Glasgow
- Flipout Gym, Glasgow
- Chapel Street Rutherglen
- Ruby Street, Glasgow
- King Street, Rutherglen
- Glasgow National Hockey Centre, Glasgow
- Cheapest nearby
- Jenny Burn Oatlands, Glasgow · 89p per kWh · 150 kW · 0.3 mi
- Fastest nearby
- Jenny Burn Oatlands, Glasgow · 150 kW · 0.3 mi