Chargeplace Scotland · EV charging site
Bunhouse Road Car Park
Bunhouse Car Park, Glasgow, G3 8DP
Bunhouse Road Car Park is an EV charging site in Glasgow, Glasgow City, run by Chargeplace Scotland. All 18 of its sockets are 7 kW Type 2, and charging is listed as free. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Riverside Museum (Chargeplace Scotland), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 6 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bunhouse Road Car Park (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Bunhouse Road Car Park (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bunhouse Road Car Park (Chargeplace Scotland) have?
18 charging sockets: 18 × 7 kW Type 2.
Who operates Bunhouse Road Car Park?
Bunhouse Road Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Bunhouse Road Car Park (Chargeplace Scotland)?
Riverside Museum (Chargeplace Scotland) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bunhouse Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bunhouse Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bunhouse Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Kelvingrove Art Galleries and Museum
- Ashton Road Car Park
- Riverside Museum
- Lilybank Car Park
- Riverside Museum
- Peel St. Car Club, Glasgow
- Fastest nearby
- Riverside Museum · 50 kW · 0.4 mi