Chargeplace Scotland · EV charging site
Cambridge Street Car Park, Glasgow (1)
Cambridge Street, Glasgow, G3 6RU
Cambridge Street Car Park, Glasgow (1) is an EV charging site in Glasgow, Glasgow City, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 43 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dundasvale Multi-Storey Car Park (Chargeplace Scotland), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Glasgow City Council
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Cambridge Street Car Park, Glasgow (1)?
Cambridge Street Car Park, Glasgow (1) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland)?
Dundasvale Multi-Storey Car Park (Chargeplace Scotland) is 80 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cambridge Street Car Park, Glasgow (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Dundasvale Multi-Storey Car Park
- Cambridge Street Car Park
- Rose Street
- Dundasvale Multi-Storey Car Park, Glasgow
- Q-Park Sauchiehall Street, Glasgow 1
- Blythswood Square
- Fastest nearby
- Dundasvale Multi-Storey Car Park · 50 kW · 80 yd