# Campbeltown Ferry Terminal · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-campbeltown-ferry-terminal-uk

Campbeltown Ferry Terminal is an EV charging site in Campbeltown, Argyll and Bute, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** New Quay Street, PA28 6AL
- **Area:** Campbeltown, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 55.42294, -5.60021

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Campbeltown Ferry Terminal (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Campbeltown Ferry Terminal (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Campbeltown Ferry Terminal (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Campbeltown Ferry Terminal?

Campbeltown Ferry Terminal is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Campbeltown Ferry Terminal (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Campbeltown Ferry Terminal (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Campbeltown Ferry Terminal (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Campbeltown](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/campbeltown)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Campbeltown: ABC Pier Building · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-campbeltown-abc-pier-building-uk) - CHAdeMO 50 kW, Type 2 50 kW · Hall Street
- [Pod Point Tesco Superstore - Campbeltown](https://ampmap.co.uk/charger/pod-point-tesco-superstore-campbeltown-uk) - Type 2 7 kW · 1 Lochend Street · From 44.4p/kWh
- [Argyll College, Millknowe Road, Campbeltown · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-argyll-college-millknowe-road-campbeltown-uk) - CCS 50 kW, CHAdeMO 50 kW · Hazelburn Business Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-campbeltown-ferry-terminal-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Feb 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.