Chargeplace Scotland · EV charging site
Cannongate Car Park, Scottish Borders
Cannongate Car Park, Scottish Borders, Jedburgh, TD8 6AJ
Cannongate Car Park, Scottish Borders is an EV charging site in Jedburgh, The Scottish Borders, run by Chargeplace Scotland. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Newtown St Boswells Old School Building (Chargeplace Scotland), 8.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 31 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Cannongate Car Park, Scottish Borders (Chargeplace Scotland) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Cannongate Car Park, Scottish Borders?
Cannongate Car Park, Scottish Borders is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
Newtown St Boswells Old School Building (Chargeplace Scotland) is 8.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cannongate Car Park, Scottish Borders (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.