# Canongate Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-canongate-car-park-uk

Canongate Car Park is an EV charging site in Jedburgh, The Scottish Borders, run by Chargeplace Scotland. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Canongate, TD8 6BE
- **Area:** Jedburgh, The Scottish Borders, United Kingdom
- **Coordinates (latitude, longitude):** 55.47702, -2.55300

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Canongate Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Canongate Car Park (Chargeplace Scotland)?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.

### How many charging sockets does Canongate Car Park (Chargeplace Scotland) have?

2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.

### Who operates Canongate Car Park?

Canongate Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Canongate Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Canongate Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Canongate Car Park (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Jedburgh](https://ampmap.co.uk/chargers/united-kingdom/the-scottish-borders/jedburgh)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Cannongate Car Park, Scottish Borders · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-cannongate-car-park-scottish-borders-uk) - CCS 50 kW, CHAdeMO 50 kW · Cannongate Car Park, Scottish Borders

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-canongate-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 May 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
