# Carlisle Road · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-carlisle-road-uk

Carlisle Road is an EV charging site in Douglas, South Lanarkshire, run by Chargeplace Scotland. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Carlisle Road, ML12 6TP
- **Area:** Douglas, South Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.46696, -3.65103

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed |
| CHAdeMO | 50 kW | 2 | Not listed |
| Type 2 | 22 kW | 6 | Not listed |

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at Carlisle Road (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does Carlisle Road (Chargeplace Scotland) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.

### Who operates Carlisle Road?

Carlisle Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Carlisle Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Carlisle Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Carlisle Road (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Douglas](https://ampmap.co.uk/chargers/united-kingdom/south-lanarkshire/douglas)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Abington Long Stay Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-abington-long-stay-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Hunters Court
- [Abington, UK · Tesla](https://ampmap.co.uk/charger/tesla-abington-supercharger-uk) - CCS 250 kW, CCS / Type 2 130 kW · M74 Junction 13 · From 60p/kWh
- [EH - Welcome Break Abington · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-welcome-break-abington-services-uk) - CHAdeMO 50 kW, CCS 45 kW · M74 J13 · From 92p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-carlisle-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 28 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
