# Carnoustie Leisure Centre · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-carnoustie-leisure-centre-2-uk

Carnoustie Leisure Centre is an EV charging site in Arbroath, Angus, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Links Parade, DD7 7JB
- **Area:** Arbroath, Angus, United Kingdom
- **Coordinates (latitude, longitude):** 56.49878, -2.71234

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Powershare could result in a limited 16A charge

## Common questions

### How much does it cost to charge at Carnoustie Leisure Centre (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Carnoustie Leisure Centre (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Carnoustie Leisure Centre (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Carnoustie Leisure Centre?

Carnoustie Leisure Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Carnoustie Leisure Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Carnoustie Leisure Centre (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Carnoustie Leisure Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Arbroath](https://ampmap.co.uk/chargers/united-kingdom/angus/arbroath)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Carnoustie Leisure Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-carnoustie-leisure-centre-uk) - Type 2 7 kW · Carnoustie Leisure Centre
- [Carnoustie Golf Hotel, Carnoustie · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-carnoustie-golf-hotel-carnoustie-uk) - Type 2 22 kW · Carnoustie Golf Hotel, Carnoustie
- [Angus Council, High Street Car Park, Carnoustie · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-angus-council-high-street-car-park-carnoustie-uk) - CCS 50 kW, CHAdeMO 50 kW · 47 High Street
- [50KW Charger At Links Avenue Car Park, Links Avenue, Carnoustie · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-50kw-charger-at-links-avenue-car-park-links-avenue-carnousti-uk) - CCS 50 kW, CHAdeMO 50 kW · Links Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-carnoustie-leisure-centre-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 18 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
