Chargeplace Scotland · EV charging site
Castleview Park and Ride
Castleview Park and Ride, Stirling, FK9 4TW
Castleview Park and Ride is an EV charging site in Stirling (FK9 4TW), run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. Amp Map lists 1 other charge point named Castleview Park and Ride in Stirling. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Castleview Park and Ride (Chargeplace Scotland), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Castleview Park and Ride (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Castleview Park and Ride (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Castleview Park and Ride?
Castleview Park and Ride is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Castleview Park and Ride (Chargeplace Scotland)?
Castleview Park and Ride (Chargeplace Scotland) is 100 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Castleview Park and Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Castleview Park and Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Castleview Park and Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Castleview Park and Ride
- Castleview Park & Ride
- Highland Gate, Stirling
- Sepa Stirling
- Forth Valley College - Stirling Campus
- Pod Point Tesco Superstore - Stirling
- Cheapest nearby
- Pod Point Tesco Superstore - Stirling · 44.4p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Highland Gate, Stirling · 300 kW · 0.2 mi