# Castleview Park and Ride · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-castleview-park-and-ride-uk

Castleview Park and Ride is an EV charging site in Stirling, run by Chargeplace Scotland. Its 32 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Kildean Roundabout, FK9 4TW
- **Area:** Stirling, United Kingdom
- **Coordinates (latitude, longitude):** 56.13124, -3.96744

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 3 | Not listed |
| CHAdeMO | 50 kW | 3 | Not listed |
| Type 2 | 43 kW | 3 | Not listed |
| Type 2 | 22 kW | 9 | Not listed |
| Type 2 | 7 kW | 20 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Castleview Park and Ride (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Castleview Park and Ride (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Castleview Park and Ride (Chargeplace Scotland) have?

32 charging sockets: 3 × 50 kW CHAdeMO, 3 × 50 kW CCS, 3 × 43 kW Type 2, 9 × 22 kW Type 2, 20 × 7 kW Type 2.

### Who operates Castleview Park and Ride?

Castleview Park and Ride is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Castleview Park and Ride (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Castleview Park and Ride (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Castleview Park and Ride (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stirling](https://ampmap.co.uk/chargers/united-kingdom/stirling/stirling)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Castleview Park and Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-castleview-park-and-ride-2-uk) - CHAdeMO 50 kW, Type 2 50 kW · Castleview Park and Ride
- [Castleview Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-castleview-park-and-ride-3-uk) - Type 2 22 kW · The Castle Business Park
- [Highland Gate, Stirling · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-highland-gate-pub-and-restaurant-uk) - CCS 300 kW, CHAdeMO 50 kW · Drip Road · From 89p/kWh
- [Sepa Stirling · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-sepa-stirling-uk) - CCS 50 kW, CHAdeMO 50 kW · Strathallan House
- [Forth Valley College - Stirling Campus · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-forth-valley-college-stirling-campus-uk) - Type 2 22 kW · 9 Huntly Crescent
- [Pod Point Tesco Superstore - Stirling](https://ampmap.co.uk/charger/pod-point-tesco-superstore-stirling-uk) - Type 2 7 kW · Wallace St · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-castleview-park-and-ride-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Jun 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
