# Chatelherault Station, Hamilton · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-chatelherault-station-hamilton-uk

Chatelherault Station, Hamilton is an EV charging site in Hamilton, South Lanarkshire, run by Chargeplace Scotland. All 4 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Leven Road, ML3 7UD
- **Area:** Hamilton, South Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.76486, -4.00535

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Chatelherault Station, Hamilton (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Chatelherault Station, Hamilton (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Chatelherault Station, Hamilton (Chargeplace Scotland) have?

4 charging sockets: 4 × 7 kW Type 2.

### Who operates Chatelherault Station, Hamilton?

Chatelherault Station, Hamilton is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Chatelherault Station, Hamilton (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chatelherault Station, Hamilton (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Chatelherault Station, Hamilton (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hamilton](https://ampmap.co.uk/chargers/united-kingdom/south-lanarkshire/hamilton)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Palace Grounds · Fastned](https://ampmap.co.uk/charger/fastned-palace-grounds-retail-park-uk) - CCS 300 kW, CCS / CHAdeMO 300 kW · Palace Grounds Road · From 79p/kWh
- [Duke Street Multi Storey Car Park, Hamilton · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-duke-street-multi-storey-car-park-hamilton-uk) - Type 2 7 kW · Duke Street
- [Keith Street Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-keith-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Keith Street
- [Duke Street Car Park, Hamilton (1) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-duke-street-car-park-hamilton-1-uk) - Type 2 7 kW · Duke Street
- [Keith St Car Park, Keith Street, Hamilton · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-keith-st-car-park-keith-street-hamilton-uk) - CHAdeMO 50 kW, Type 2 50 kW · 6 Keith Street
- [Hamilton Palace Football Pavilion Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-hamilton-palace-football-pavilion-car-park-uk) - Type 2 22 kW · Mote Hill Car Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-chatelherault-station-hamilton-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
