Chargeplace Scotland · EV charging site
Civic Centre Car Park, East Kilbride (1)
Andrew Street, East Kilbride, G74 1AB
Civic Centre Car Park, East Kilbride (1) is an EV charging site in East Kilbride, South Lanarkshire, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is James Hamilton Heritage Loch Car Park (Chargeplace Scotland), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: South Lanarkshire Council
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Civic Centre Car Park, East Kilbride (1)?
Civic Centre Car Park, East Kilbride (1) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland)?
James Hamilton Heritage Loch Car Park (Chargeplace Scotland) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Civic Centre Car Park, East Kilbride (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Civic Centre Car Park, East Kilbride
- Atholl House
- Village Theatre, East Kilbride
- East Kilbride Railway Station, East Kilbride
- Falkland Place
- South Lanarkshire College
- Fastest nearby
- South Lanarkshire College · 22 kW · 0.8 mi