Chargeplace Scotland · EV charging site
Community Centre, Cockenzie Port Seton
Community Centre, Musselburgh, EH32 0BQ
Community Centre, Cockenzie Port Seton is an EV charging site in Musselburgh, East Lothian, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Port Seton Community Centre (Chargeplace Scotland), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Community Centre, Cockenzie Port Seton (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Community Centre, Cockenzie Port Seton (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Community Centre, Cockenzie Port Seton?
Community Centre, Cockenzie Port Seton is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Community Centre, Cockenzie Port Seton (Chargeplace Scotland)?
Port Seton Community Centre (Chargeplace Scotland) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Community Centre, Cockenzie Port Seton (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Community Centre, Cockenzie Port Seton (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Community Centre, Cockenzie Port Seton (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Port Seton Community Centre
- Thomson Crescent, Port Seton
- Hawthorn Road Car Park
- Community Centre, Prestonpans
- Prestonpans Railway Station, Prestonpans
- High Street Prestonpans, Fast Charger
- Fastest nearby
- Port Seton Community Centre · 50 kW · 60 yd