# Croy Railway Station, Croy · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-croy-railway-station-croy-uk

Croy Railway Station, Croy is an EV charging site in Cumbernauld, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Constarry Road, G65 9HT
- **Area:** Cumbernauld, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.95520, -4.03649

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Croy Railway Station, Croy (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Croy Railway Station, Croy (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Croy Railway Station, Croy (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Croy Railway Station, Croy?

Croy Railway Station, Croy is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Croy Railway Station, Croy (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Croy Railway Station, Croy (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Croy Railway Station, Croy (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cumbernauld](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/cumbernauld)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Croy Park and Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-croy-park-and-ride-2-uk) - CCS 22 kW, CHAdeMO 22 kW · 61 Constarry Road
- [Croy Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-croy-park-and-ride-uk) - Type 2 22 kW · 61 Constarry Road
- [Pod Point Tesco Superstore - Glasgow Craigmarloch](https://ampmap.co.uk/charger/pod-point-tesco-superstore-glasgow-craigmarloch-uk) - Type 2 7 kW · 15 Auchinbee Way Cumbernauld · From 44.4p/kWh
- [Cumbernauld Retail Park, Cumbernauld · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-cumbernauld-retail-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Cumbernauld Retail Park · From 89p/kWh
- [Craiglinn SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-craiglinn-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Craiglinn Park Road
- [The Red Deer · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-the-red-deer-uk) - CCS / CHAdeMO 50 kW · The Red Deer, Auchenkilns Park, Cumbernauld · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-croy-railway-station-croy-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Apr 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
