# Davies Row, Falkirk · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-davies-row-falkirk-uk

Davies Row, Falkirk is an EV charging site in Falkirk, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Davies Row, FK6 6FA
- **Area:** Falkirk, United Kingdom
- **Coordinates (latitude, longitude):** 56.02378, -3.90944

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Davies Row, Falkirk (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Davies Row, Falkirk (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does Davies Row, Falkirk (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2, 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates Davies Row, Falkirk?

Davies Row, Falkirk is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Davies Row, Falkirk (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Davies Row, Falkirk (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Davies Row, Falkirk (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Falkirk](https://ampmap.co.uk/chargers/united-kingdom/falkirk/falkirk)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Denny Sports Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-denny-sports-centre-uk) - Type 2 7 kW · Carronbank Crescent
- [Foundry Loan · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-foundry-loan-uk) - Type 2 7 kW · 24 Foundry Loan
- [Larbert Railway Station · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-larbert-railway-station-uk) - Type 2 22 kW · Foundry Loan (East)
- [Scottish Canals, Falkirk Wheel · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-scottish-canals-falkirk-wheel-2-uk) - Type 2 22 kW · Lime Road
- [Scottish Canals - Falkirk Wheel · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-scottish-canals-falkirk-wheel-uk) - Type 2 22 kW · Lime Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-davies-row-falkirk-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
