Chargeplace Scotland · EV charging site
Dog Day Care Centre
Ashbank, Bonnyrigg, EH23 4NJ
Dog Day Care Centre is an EV charging site in Bonnyrigg, Midlothian, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Starbucks, Bonnyrigg Road, Dalkeith (Osprey Charging), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Dog Day Care Centre Access: 24 hours Left hand side of car park
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dog Day Care Centre (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dog Day Care Centre (Chargeplace Scotland) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Dog Day Care Centre?
Dog Day Care Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Dog Day Care Centre (Chargeplace Scotland)?
Starbucks, Bonnyrigg Road, Dalkeith (Osprey Charging) is 3.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dog Day Care Centre (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dog Day Care Centre (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dog Day Care Centre (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.