Chargeplace Scotland · EV charging site
Dounby Primary School (2)
Dounby primary school, Stromness, KW17 2JA
Dounby Primary School (2) is an EV charging site in Stromness, Orkney Islands, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dounby Community School, Orkney (Chargeplace Scotland), 160 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Orkey Islands Council
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dounby Primary School (2) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Dounby Primary School (2) (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Dounby Primary School (2)?
Dounby Primary School (2) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Dounby Primary School (2) (Chargeplace Scotland)?
Dounby Community School, Orkney (Chargeplace Scotland) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dounby Primary School (2) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dounby Primary School (2) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dounby Primary School (2) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Dounby Community School, Orkney · 50 kW · 160 yd