# Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-dumfries-and-galloway-council-offices-daar-road-kirkcudbrigh-uk

Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright is an EV charging site in Kirkcudbright, Dumfries and Galloway, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright, DG6 4JG
- **Area:** Kirkcudbright, Dumfries and Galloway, United Kingdom
- **Coordinates (latitude, longitude):** 54.83519, -4.05245

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.25/kWh;min £1.50 (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland)?

The listed price is £0.25/kWh;min £1.50. Prices can change, so check the price at the charger before you start.

### How fast is charging at Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright?

Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Dumfries and Galloway Council Offices, Daar Road, Kirkcudbright (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kirkcudbright](https://ampmap.co.uk/chargers/united-kingdom/dumfries-and-galloway/kirkcudbright)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Swarco 7KW · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-swarco-7kw-5-uk) - Type 2 7 kW · Daar Rd
- [Harbour Square Car Park, Kirkcudbright · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-harbour-square-car-park-kirkcudbright-uk) - CCS 50 kW, CHAdeMO 50 kW · Harbour Square Car Park
- [EH - Cocoa Bean Company · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-cocoa-bean-company-uk) - CCS 60 kW, CHAdeMO 60 kW · A75 · From 85p/kWh
- [Solway View Campsite · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-solway-view-campsite-uk) - Type 2 7 kW · Balmangan Farm Borgue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-dumfries-and-galloway-council-offices-daar-road-kirkcudbrigh-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Jul 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
