Chargeplace Scotland · EV charging site
Dunoon: Coal Pier
24 Argyll Street, Greenock, PA23 7LU
Dunoon: Coal Pier is an EV charging site in Greenock, Inverclyde, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Alexandra Parade (Chargeplace Scotland), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dunoon: Coal Pier (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Dunoon: Coal Pier (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Dunoon: Coal Pier?
Dunoon: Coal Pier is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Dunoon: Coal Pier (Chargeplace Scotland)?
Alexandra Parade (Chargeplace Scotland) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dunoon: Coal Pier (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dunoon: Coal Pier (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dunoon: Coal Pier (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Alexandra Parade
- Caledonia House, Dunoon
- EVC Kip Marina
- Main Road
- Main Street Inverkip 22 KW
- Sainsburys Inverkip - 0185
- Cheapest nearby
- Sainsburys Inverkip - 0185 · 69p per kWh · 100 kW · 3.4 mi
- Fastest nearby
- Sainsburys Inverkip - 0185 · 100 kW · 3.4 mi