Chargeplace Scotland · EV charging site
Dunrossness Car Park
Dunrossness, Sandwick, ZE2 9JG
Dunrossness Car Park is an EV charging site in Sandwick, Shetland Islands, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and no site with 50 kW or more is listed within 15 miles.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 2 Jun 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Dunrossness Car Park (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Dunrossness Car Park (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dunrossness Car Park (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Dunrossness Car Park?
Dunrossness Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Dunrossness Car Park (Chargeplace Scotland)?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Dunrossness Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dunrossness Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dunrossness Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.