# Duthie Park / Polmuir Road · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-duthie-park-polmuir-road-uk

Duthie Park / Polmuir Road is an EV charging site in Aberdeen, Aberdeen City, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Polmuir Road, AB11 7TH
- **Area:** Aberdeen, Aberdeen City, United Kingdom
- **Coordinates (latitude, longitude):** 57.13267, -2.10260
- **Getting there:** Located on the right of the parking "arc" at the Polmuir Road entrance to Duthie Park.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** One bay reserved for Co-Wheels Club EV.

## Common questions

### How much does it cost to charge at Duthie Park / Polmuir Road (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Duthie Park / Polmuir Road (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Duthie Park / Polmuir Road (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Duthie Park / Polmuir Road?

Duthie Park / Polmuir Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Duthie Park / Polmuir Road (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Duthie Park / Polmuir Road (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Duthie Park / Polmuir Road (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen)
- [Cheapest charging in Aberdeen](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/aberdeen/cheapest)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [MFG Esplanade - MFG EV Power](https://ampmap.co.uk/charger/mfg-esplanade-mfg-ev-power-uk) - CCS 300 kW, CCS 150 kW · MFG Esplanade Service Station
- [Abbotswell Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-abbotswell-road-uk) - Type 2 22 kW · Abbotswell Road, Aberdeen, AB12 3AD · From 65p/kWh
- [Broomhill Road · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-broomhill-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Broomhill Road
- [Arnold Clark Charge · Arnold Clark Dealer Network](https://ampmap.co.uk/charger/arnold-clark-charge-uk) - CCS 150 kW, CHAdeMO 50 kW · Craigshaw Road
- [Pod Point Union Square](https://ampmap.co.uk/charger/zero-carbon-world-union-square-car-park-uk) - Type 2 7 kW · 12 Union Square Guild Street · From 34.8p/kWh
- [John Clark BMW · Chargemaster](https://ampmap.co.uk/charger/chargemaster-john-clark-bmw-uk) - Type 2 7 kW · Craigshaw Crescent

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-duthie-park-polmuir-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Apr 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
