# E-Centre · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-e-centre-uk

E-Centre is an EV charging site in Alloa, Clackmannanshire, run by Chargeplace Scotland. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Cooperage Way Business Village, FK10 3LP
- **Area:** Alloa, Clackmannanshire, United Kingdom
- **Coordinates (latitude, longitude):** 56.12195, -3.77871

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at E-Centre (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at E-Centre (Chargeplace Scotland)?

Up to 22 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does E-Centre (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates E-Centre?

E-Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at E-Centre (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at E-Centre (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at E-Centre (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Alloa](https://ampmap.co.uk/chargers/united-kingdom/clackmannanshire/alloa)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Forth Valley College - Alloa Campus · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-forth-valley-college-alloa-campus-uk) - Type 2 7 kW · 1 Devon Road
- [King Street Car Park, Alloa · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-king-street-car-park-alloa-uk) - CCS 50 kW, CHAdeMO 50 kW · King Street
- [Alloa, Alloa Park Drive · Source EV](https://ampmap.co.uk/charger/source-ev-uk-alloa-alloa-park-drive-uk) - CCS 300 kW · Clackmannan Road Roundabout · From 90p/kWh
- [Pod Point Tesco Extra - Alloa](https://ampmap.co.uk/charger/pod-point-tesco-extra-alloa-2-uk) - Type 2 7 kW · Auld Brig Road · From 44.4p/kWh
- [Greenside Street Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-greenside-street-car-park-uk) - Type 2 7 kW · Greenside Street
- [Kilncraigs Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kilncraigs-car-park-uk) - Type 2 7 kW · Greenside Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-e-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 19 Sept 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
