Chargeplace Scotland · EV charging site
EAE Ltd, Loanhead
Edgefield Industrial Estate, Bonnyrigg, EH20 9TB
EAE Ltd, Loanhead is an EV charging site in Bonnyrigg, Midlothian, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Straiton Retail Park Lower Terrace DC (Straiton) (evyve), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EAE Ltd, Loanhead (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does EAE Ltd, Loanhead (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates EAE Ltd, Loanhead?
EAE Ltd, Loanhead is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Can anyone charge at EAE Ltd, Loanhead (Chargeplace Scotland)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to EAE Ltd, Loanhead (Chargeplace Scotland)?
Straiton Retail Park Lower Terrace DC (Straiton) (evyve) is 0.6 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EAE Ltd, Loanhead (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EAE Ltd, Loanhead (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EAE Ltd, Loanhead (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Paradykes Primary School, Loanhead
- Straiton Retail Park Lower Terrace DC (Straiton)
- Straiton, Loanhead
- Straiton Retail Park Upper Terrace (Straiton)
- Straiton
- Straiton Park & Ride, Straiton
- Cheapest nearby
- Straiton Retail Park Upper Terrace (Straiton) · 65p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Straiton Retail Park Lower Terrace DC (Straiton) · 75 kW · 0.6 mi