Chargeplace Scotland · EV charging site
Edinburgh College, Midlothian Campus
Dalhousie Road, Bonnyrigg, EH22 3FR
Edinburgh College, Midlothian Campus is an EV charging site at Dalhousie Road in Bonnyrigg, Midlothian, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. Amp Map lists 1 other charge point named Edinburgh College, Midlothian Campus in Bonnyrigg. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's, Dalkeith (Osprey Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Midlothian Council
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Edinburgh College, Midlothian Campus (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Edinburgh College, Midlothian Campus (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Edinburgh College, Midlothian Campus?
Edinburgh College, Midlothian Campus is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Edinburgh College, Midlothian Campus (Chargeplace Scotland)?
McDonald's, Dalkeith (Osprey Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Edinburgh College, Midlothian Campus (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Edinburgh College, Midlothian Campus (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Edinburgh College, Midlothian Campus (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Midlothian Campus, Edinburgh
- Edinburgh College, Midlothian Campus
- Eskbank Railway Station
- Pod Point Tesco Superstore - Dalkeith Hardengreen
- Eskbank Station
- McDonald's, Dalkeith
- Cheapest nearby
- Pod Point Tesco Superstore - Dalkeith Hardengreen · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- McDonald's, Dalkeith · 50 kW · 0.4 mi