Chargeplace Scotland · EV charging site
Falls of Shin Community Project, Lairg
Falls of Shin Visitors Centre, Dornoch, IV27 4EE
Falls of Shin Community Project, Lairg is an EV charging site in Dornoch, Highland, run by Chargeplace Scotland. It has a single socket, with Type 2, CCS and CHAdeMO at up to 22 kW, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Tongue Car Park (Chargeplace Scotland), 4.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 25 Sept 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
Up to 22 kW AC via Type 2, CCS, CHAdeMO.
How many charging sockets does Falls of Shin Community Project, Lairg (Chargeplace Scotland) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 22 kW CCS, 1 × 22 kW CHAdeMO.
Who operates Falls of Shin Community Project, Lairg?
Falls of Shin Community Project, Lairg is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
Tongue Car Park (Chargeplace Scotland) is 4.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Falls of Shin Community Project, Lairg (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.