Chargeplace Scotland · EV charging site
FC18127
Prestonfield Avenue, Edinburgh, EH16 5EB
FC18127 is an EV charging site at Prestonfield Avenue in Edinburgh, City of Edinburgh, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is East Neighbourhood Office (Chargeplace Scotland), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at FC18127 (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does FC18127 (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates FC18127?
FC18127 is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to FC18127 (Chargeplace Scotland)?
East Neighbourhood Office (Chargeplace Scotland) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at FC18127 (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at FC18127 (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at FC18127 (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.