# Ferry Road (West) Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-ferry-road-west-car-park-uk

Ferry Road (West) Car Park is an EV charging site in Stromness, Orkney Islands, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ferry Road, KW16 3AD
- **Area:** Stromness, Orkney Islands, United Kingdom
- **Coordinates (latitude, longitude):** 58.96609, -3.29533

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 11 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Ferry Road (West) Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Ferry Road (West) Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Ferry Road (West) Car Park (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 2 × 11 kW Type 2.

### Who operates Ferry Road (West) Car Park?

Ferry Road (West) Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Ferry Road (West) Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ferry Road (West) Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ferry Road (West) Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stromness](https://ampmap.co.uk/chargers/united-kingdom/orkney-islands/stromness)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Stromness Ferry Road (West) Long Stay Car Par · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stromness-ferry-road-west-long-stay-car-par-uk) - Type 2 22 kW · 63 John Street
- [Stromness Ferry Terminal Rapid (triple Outlet) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stromness-ferry-terminal-rapid-triple-outlet-uk) - CCS 50 kW, CHAdeMO 50 kW · Stromness Ferry Terminal
- [Old Academy · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-old-academy-uk) - Type 2 11 kW · Back Road
- [Stromness Care Home Ac22 Dual · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stromness-care-home-ac22-dual-uk) - Type 2 22 kW · Quoys

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-ferry-road-west-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Feb 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
